Trusted by over 1,000 ★★★★★ customers | Veteran Owned 🇺🇸
Licensed • Permitted • Code Compliant

Generator Transfer Switch Installation
Severance

Automatic & Manual Transfer Switches • Whole House Generator Wiring • Safe, Permitted Installations

Automatic Transfer Switches
Manual & Load Management
Permitted & Inspected
SCROLL TO SEE HOW IT WORKS
🔄
Automatic ATS
🔌
Manual Switches
🏠
Whole House
📊
Load Management
Permitted Work

A generator without a transfer switch is half a system.

That is the technical reality, plainly stated. The generator produces power. The transfer switch decides where the power goes — to the home, away from the utility line, isolated from the grid so utility crews are not endangered by backfeed.

Lincolnton Solar Electric Services installs generator transfer switches across Severance, CO with full attention to code, safety, and long-term reliability.

Equipment We Install and Why Each Matters

The right transfer switch depends on your generator type, load profile, and desired automation level.

🏠

Automatic Service-Entrance ATS

Full automatic transfer for whole-house backup. Senses outage, starts generator, and transfers load seamlessly.

Install Automatic Transfer Switch
🔧

Manual Transfer Switches

Safe, code-compliant solution for portable generators with exterior inlet box and labeled critical circuits.

Get Manual Transfer Switch Installed

Load-Managed Systems

Intelligent load shedding for smaller generators on larger services.

Standby Generator Integration

Full electrical wiring, control connections, and proper neutral bonding.

Process — How the Project Sequences

1

Site Visit & Load Study

NEC Article 220 calculation and written scope

2

Permit & Equipment

Coordination with gas contractor when needed

3

Installation Day

1–2 days for most systems

4

Commissioning & Inspection

Full load test and inspector walkthrough

Emergency Power Electrician for Existing System Failures

We repair and replace failed transfer switches, contactors, and control boards — often same-day during outages.

Use vs Don't Use — Honest Guidance

We help you choose between automatic whole-house systems, manual critical-load setups, or load-managed solutions based on your actual needs and outage patterns in Severance.

Why Transfer Switches Fail Before Generators Do

Transfer switches endure constant electrical stress. Annual loaded exercising and maintenance dramatically extend their service life.

Generator Transfer Switch Installation in Severance: Frequently Asked Questions

Do all transfer switch installations need a permit in Severance?

Yes. Every transfer switch installation requires an electrical permit and a final inspection. We pull the permit, schedule the inspection, and meet the inspector.

How long does the project take from approval to power-up?

Most whole-house automatic installations in Severance, CO complete in one to two working days for the on-site work, with permit and inspection scheduling adding one to three weeks total project timeline.

What size generator do I actually need?

The answer depends on what you want the generator to power. We perform the load calculation during the site visit and present the options.

Can you tie into a generator I already own?

Yes. Retrofit installations are common in Severance. We work with portable generators, existing standby units, and units the homeowner has on order.

What is the warranty on the install?

The generator and transfer switch carry their manufacturer warranties. The installation labor carries our workmanship warranty.

Ready for Reliable Backup Power?

Start with a professional site visit and load study.

Click Here to Call (888) 355-9624

Same-day response available for emergency repairs

Click Here to Call (888) 355-9624

Our Other Electrical Services in Severance, CO

Whole House Surge Protection InstallationGenerator Transfer Switch InstallationElectrical Troubleshooting & Fault DiagnosisAluminum Wiring Replacement & Remediation

We Serve These Areas

EV Charger Installation in Carrizo Springs, TXEV Charger Installation in Lake Telemark, NJEV Charger Installation in Bethel Park, PAEV Charger Installation in Burnsville, MNEV Charger Installation in Washburn, NDEV Charger Installation in Newington Forest, VAEV Charger Installation in Mountain City, TNEV Charger Installation in Ardmore, TNEV Charger Installation in Rock Valley, IAEV Charger Installation in Cross Mountain, TXEV Charger Installation in Nisswa, MNEV Charger Installation in Grill, PAEV Charger Installation in Zeigler, ILEV Charger Installation in La Puebla, NMEV Charger Installation in Reminderville, OHEV Charger Installation in Clarendon, AREV Charger Installation in Three Points, AZEV Charger Installation in Highland City, FLEV Charger Installation in Speers, PAEV Charger Installation in East Sandwich, MAEV Charger Installation in Ocean City, FLEV Charger Installation in Medina, WAEV Charger Installation in Arden On The Severn, MDEV Charger Installation in William Paterson University Of New Jersey, NJEV Charger Installation in Monmouth, OREV Charger Installation in Gillett, WIEV Charger Installation in Dunstan, MEEV Charger Installation in Patterson, LAEV Charger Installation in Penrose, COEV Charger Installation in Mangum, OKEV Charger Installation in Hewlett Harbor, NYEV Charger Installation in Willow Springs, ILEV Charger Installation in Caledonia, MNEV Charger Installation in Bloomville, OHEV Charger Installation in Clinton, MIEV Charger Installation in Monongah, WVEV Charger Installation in Keewatin, MNEV Charger Installation in Comfort, TXEV Charger Installation in Dover, OHEV Charger Installation in Jacksonville Beach, FLEV Charger Installation in Drain, OREV Charger Installation in Harrington, DEEV Charger Installation in Hoyt Lakes, MNEV Charger Installation in Chickasaw, ALEV Charger Installation in Greendale, INEV Charger Installation in Lynnwood, WAEV Charger Installation in Medical Lake, WAEV Charger Installation in Owensville, INEV Charger Installation in Flatwoods, KYEV Charger Installation in South Run, VA